Shop – Finishing the Foundation

 

They preped the foundation today, I tried to put as much of the electrical conduit in the foundations as I can. There are 4 zones per side. One in the floor and 3 about10 feet apart. I will show more pictures when I get to the wiring.

 

 

You can also see the 4 floor plug boxes. The main conduit is 1 inch and the side branches are 3/4 inch.

 

Here they are Pouring the cement:

 

Slab all finished up.

It took 3 days, a stuck cement truck, a dumped cement load,and a lot of Honey Buns. But is is finished.